• OPENING TIME
  • All Days 9:00 to 18:00
  • CALL US 24/7
  • +1 (718) 844-7878
  • EMAIL US
  • services@hitechcentralair.com

BMW

Features

Up to 95% AFUE
Modulating
Gas-fired
Integrated boiler control
Stainless steel heat exchanger
Built in primary/secondary piping
15-year heat exchanger limited parts warranty and 10-year limited parts warranty with timely registration1


Specifications

PERFORMANCE

Energy Efficiency Up to 95% AFUE
Rated Heating Input 50,000 - 299,000 BTUH
Rated Heating Capacity 46,000 - 273,000 BTUH
Heat Format Water

ENERGY STAR®

Details Meets ENERGY STAR® guidelines for efficiency

CONTROLS

Control Type Integrated boiler control

TECHNOLOGY

Heat Exchanger Stainless Steel
Burners Pre-mix
Ignition Direct Spark
Venting Direct
Fuel Gas

AESTHETICS

Casing Full fiberglass insulation
Section Seals Cast iron push nipples